How TestHut counts toward AS 1851

Every rule below is taken from AS 1851-2012 with Amendment 1 (2016), and shown with the clause it comes from. The rules are paraphrased. Read the standard itself for the full wording.

Detectors and call points, each year

DeviceWhat is testedWhere it comes from
Smoke detectorsHalf on each circuit every year, so all are tested within two yearsAppendix G, clause G4
Heat detectorsA fifth on each circuit every year, counting the last detector on the circuit, so all are tested within five yearsClause G2
Manual call pointsAll of themTable 6.4.1.4 item 3.3
Flame and beam detectors, special hazard detectorsAll of themTable 6.4.1.4 item 3.8, clauses G8 and G11
CO fire detectorsAt least half each year, all within two years, with test gasClause G13
Aspirating detectorsSmoke into the last sampling point of each pipe run, transport time recordedClause G9
Linear heatHeated at a random spot, different from earlier testsClause G3
Multi-sensor detectorsTested as the type they were installed asClause G15

Clause G2 also asks for the heat detector sample to represent the models, types and locations on the circuit. The app leaves the choice to the technician and reminds them.

When a detector fails

Clause G16.1 says at least 10 of the remaining detectors on that circuit are then tested. If another one fails during that extra testing, the rest of the circuit is tested. Every detector that fails is replaced.

TestHut applies this by default. A company can switch it off in the portal's Settings, where the clause reference is shown beside the switch, so the decision is made knowingly.

Inputs tested more often

Six-monthlyEach sprinkler flow switch and valve monitor. Table 2.4.2.2 items 2.2 and 2.4
MonthlySprinkler pressure switch alarm. Table 2.4.2.1 items 1.12 and 1.13
MonthlyPump running alarms and the diesel charger power failure alarm. Table 3.4.1 items 1.14 and 1.18

A pass on one of these counts only for its own period. After that the app shows it as due again.

Where the standard does not say

These are TestHut's own rules, not the standard's. Each one is a reading your company can disagree with.

What a circuit is

The standard counts per circuit and does not define one. TestHut treats each loop on an addressable panel as a circuit.

Which heat detector is last

The standard defines the last detector only for collective circuits. On a loop TestHut takes the highest address until someone marks the right one.

Which half this year

The standard gives the two and five year limits. TestHut works out which devices that leaves and marks them Required.

When the year starts

A yearly service has a tolerance of two months either side. TestHut starts the testing year when that window opens.

Devices that cannot be reached

The standard is silent. A device marked N/A still counts in the total, and a required one is reported as an exception.

A failure left open

A failed device that was never passed carries into the next year until it is.

Warning systems

The yearly check on an emergency warning system is that it can be heard in every area (Table 6.4.3.2 item 2.17). Sound level readings are a five-yearly item. The app records readings when you take them and does not ask for them when the standard does not.

Design sound levels come from AS 1670.4. The app shows them as a guide, not as a pass mark.

What counts as a pass

Either the panel reports the device during a test, or the technician marks it passed by hand. Hand passes are labelled in every report.

A site can be counted two ways: the AS 1851 sample method above, or every device every year where the owner or the contract asks for it.