Staging site. TestHut is in development and has not been tested on a live fire panel yet. The app and portal run on sample data.

One technician. The whole yearly test.

TestHut is a carry case that plugs into the fire panel's printer port, and a phone app that counts every device you set off against AS 1851. Nobody has to stand at the panel calling out zones.

Illustration of the TestHut case, open, with one socket for each panel family
Illustration of the planned unit

The second technician is only there to read the panel

On a yearly test one person walks the building with the smoke pole. The other stands at the panel, reads out what came up, and writes it down. That is two wages for one job.

The panel already sends every alarm to its printer port. TestHut reads that output and sends it over the mobile network to your TestHut account. The person doing the testing sees it in the app within seconds, and the office sees it in the portal at the same moment.

  • Today2 technicians over 2 days
  • With TestHut1 technician over 2 days
Panel printer output, sample data
  1. 09:14:02ALARM L1 D014 SMOKE
    LVL 3 EAST CORRIDOR
    counted
  2. 09:15:40ALARM L1 D015 SMOKE
    LVL 3 STORE ROOM
    counted
  3. 09:17:11ALARM L1 D019 HEAT
    LVL 3 KITCHEN
    counted
  4. 09:19:26ALARM L2 D003 MCP
    LVL 3 STAIR 2 EXIT
    counted
  5. 09:22:05ALARM L2 D007 SMOKE
    LVL 3 PLANT ROOM
    counted
Loop 1 smoke detectors14 of 22 needed this year
Illustration of the TestHut case with the cover lifted, showing the gateway, battery and interface cards
Illustration of the planned case with the cover lifted. Not a photograph of a finished unit.

One case, one lead to the panel

Everything the job needs is in the case. The gateway, battery and cards sit under a fixed cover, so the technician only ever handles one lead.

You buy a base unit and add a card pack for each panel family you look after.

See inside the case

What a test day looks like

  1. Scan the label on the panel

    Each registered panel carries a QR label. Scanning it, with the phone's location, loads that building's device list and the right settings for that panel type.

  2. Plug the case into the panel

    One lead from the case to the panel's printer port. The case has its own battery, so it takes nothing from the panel.

  3. Put the panel in its walk test mode

    The app shows the steps for that panel, taken from the manufacturer's manual. Isolate the brigade signal the way you do today.

  4. Walk the building

    Set off a detector and it ticks off on the phone within seconds. The app shows what is still needed on each circuit to meet the year.

  5. Sign off on site

    Failures, notes and photos are recorded as you go. The office sees the results in the portal and the report is ready the same day.

Phone app during a test, showing detectors ticking off as the panel reports themPhone app site overview showing progress against the yearly target

It counts the way the standard counts

The app works out the yearly target circuit by circuit, from AS 1851-2012 with Amendment 1. Every rule in it points to the clause it came from.

Smoke detectorsHalf of each circuit, every year
Heat detectorsA fifth of each circuit, counting the last one
Manual call pointsAll of them, every year
After a failure10 more on that circuit, as clause G16.1 asks

Read every rule and its clause

More than detectors

The app carries the routine service schedule for the dry fire equipment that reports to the panel. Items only appear if that building has them.

Warning systems

EWIS and occupant warning checks, speaker by speaker, warden phones, and a pin on the floor plan where something failed.

Fans and smoke control

The fire fan matrix: each alarm zone against each fan and damper, checked at the panel and at the fan.

Pumps and sprinkler signals

Flow switches, valve monitors and pump alarms, each on its own six-monthly or monthly period.

Faults and supervision

The fault list for the panel, power supply and signalling links, with the table item each one comes from.

Contract scope

Not contracted for fans or sprinklers at a site? Switch them off for that building and the test closes without them.

Tests over several days

Leave a test open, come back tomorrow, carry on. A finished test can be reopened if something was missed.

The office sees it as it happens

The portal shows every building, how far through the year it is, what failed and what is waiting on a quote. Panels are registered by the office, so a technician cannot start billing on a new building by accident.

Open the portal demo

Office portal overview listing buildings and their yearly progress

Priced per building, per year

$450 a year for each building, less as you add more. $1,500 once for each test unit. One unit does as many buildings as one technician can get to.